LEGACY WAY
Transcity JV Project (Legacy Way) twin two-lane tunnels will include the following:
37 Underground cross passages which will connect Legacy Way’s
two tunnels every 120m to provide safe access between the tunnels in the event of an incident.
A Longitudinal ventilation System to manage in-tunnel air quality fire protection and safety management systems.
A free-flow electronic tolling system.